Draws attention to a serious shortcoming associated with the usual audit models which use traditional techniques such as regression analysis. In general, previous studies have concentrated only on the impact of the resources used by an organization on its performance indicators, and have ignored the obverse impact of performance indicators on resource use. Yet, if performance indicators are to be effective, it is inevitable that, at least in the long run, they will induce political responses, often in the form of redirected use of resources. Develops concept of “negative political feedback”to elucidate this issue, and attempts to incorporate the phenomenon into the modelling procedure. The results are not encouraging; ends by questioning whether quantitative effectiveness audit is itself a worthwhile procedure for promoting effectiveness in public sector organizations.
Article navigation
1 March 1992
Editors
Research Article|
March 01 1992
Negative Political Feedback: An Examination of the Problem of Modelling Political Responses in Public Sector Effectiveness Auditing
Publisher: Emerald Publishing
Online ISSN: 1758-4205
Print ISSN: 1368-0668
© MCB UP Limited
1992
Accounting, Auditing & Accountability Journal (1992) 5 (1)
Citation
Smith P (1992), "Negative Political Feedback: An Examination of the Problem of Modelling Political Responses in Public Sector Effectiveness Auditing". Accounting, Auditing & Accountability Journal, Vol. 5 No. 1 pp. No Pagination Specified, doi: https://doi.org/10.1108/09513579210008208
Download citation file:
166
Views
New and popular articles
Suggested Reading
“Negative Political Feedback” – A Postscript
Accounting, Auditing & Accountability Journal (March,1992)
Negative Political Feedback or the Auditor”s Tar Baby?Comments on “An Examination of the Problem of Modelling Political Responses in Public Sector Effectiveness Auditing”
Accounting, Auditing & Accountability Journal (March,1992)
KPIs for facility's performance assessment, Part II: identification of variables and deriving expressions for core indicators
Facilities (April,2014)
KPIs for facility's performance assessment, Part I: identification and categorization of core indicators
Facilities (April,2014)
PERFORMANCE INDICATORS: THE LIBRARIAN′S CHALLENGE
Library Management (May,1990)
Related Chapters
The Public Sector Accounting, Accountability and Auditing in Emerging Economies: Insights, Gaps and Some New Ways Forward
The Public Sector Accounting, Accountability and Auditing in Emerging Economies
Performance measures for highway structures
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Decision-Making in a Public Hospital During Economic Crisis
Trade Tales: Decoding Customers' Stories
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
