Open figure viewer
About 30 years ago the Dortmund‐Ems Canal started to be adapted for modern traffic. Steel piling was used at that time to protect the canal banks. When the work was resumed after the war investigations were carried out to determine how far steel sheet piling could be used for the work to be carried out.
This content is only available via PDF.
© MCB UP Limited
1957
You do not currently have access to this content.
