Skip to Main Content
Article navigation

After dealing in Part 1 with the actual corrosion of pipelines under the varied atmospheric and ground conditions in the Middle East, Mr. Sparrow deals with practical problems in the construction of groundbeds in the desert, their siting, and the siting of terminals and tank farms. Stress is laid on the importance of regular and thorough checking of pipeline protection methods, both pipe wrapping and cathodic protection.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal