Open figure viewer
After dealing in Part 1 with the actual corrosion of pipelines under the varied atmospheric and ground conditions in the Middle East, Mr. Sparrow deals with practical problems in the construction of groundbeds in the desert, their siting, and the siting of terminals and tank farms. Stress is laid on the importance of regular and thorough checking of pipeline protection methods, both pipe wrapping and cathodic protection.
This content is only available via PDF.
© MCB UP Limited
1959
You do not currently have access to this content.
