Skip to Main Content
Article navigation

Solutions had to be found to various corrosion problems at the Ship Hydrodynamics Laboratory at Feltham if the operations for which the laboratory was designed were to proceed properly. The laboratory, opened last October, will be part of the Ship Division, N.P.L., which already has two towing tanks and a small water tunnel at Teddington.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal