Open figure viewer
IV. SCHEDULING IT has been illustrated in Section III that over‐suitability in the engineering department is an inevitability if efficient working of an airline is sought after, for the cost of a certain degree of over‐suitability can be more than offset by the corresponding gain from improved flying operations. But even so, this over‐suitability is still a liability, so if means arc available to reduce the cost, these should be explored and exploited.
This content is only available via PDF.
© MCB UP Limited
1942
You do not currently have access to this content.
