During the design of the Atlas I.C.B.M. it was considered necessary to conduct full‐scale combined structural loading and aerodynamic heating tests for the purpose of proving the ability of the nose adaptor and thrust barrel to withstand the combined effects of load and temperature. The following items were required to perform the tests: heating elements to radiate 450 sq. ft. of specimen area at a maximum rate of 10,000 B.T.U/sq. ft./hr., 1,500 KVA at 44 volts for six mins., controller, three variable pressure regulators for programming 3,000 lb./sq. in. hydraulic pressure to the loading cylinders, six‐channel programmer for varying heating and loading rates, a method for relating the capabilities of the equipment to the desired heat and load curves. Descriptions arc given of the heating equipment, heat controller, load controller, programmer, preliminary heat tests, preliminary load tests and test programmes as used by the Systems Test Laboratory of Convair‐Astronautics. As experience was gained by testing the need for preliminary tests was greatly reduced. The method described continues to be a valuable tool for performing full‐scale missile structural tests.
Article navigation
Review Article|
January 01 1961
S.A.E. National Aeronautic Meeting—2: Summaries of a Selection of the Papers Presented at the Meeting Held in Los Angeles, October 10–14, 1960
Publisher: Emerald Publishing
Online ISSN: 2059-9366
Print ISSN: 0002-2667
© MCB UP Limited
1961
Aircraft Engineering (1961) 33 (1): 15.
Citation
(1961), "S.A.E. National Aeronautic Meeting—2: Summaries of a Selection of the Papers Presented at the Meeting Held in Los Angeles, October 10–14, 1960". Aircraft Engineering, Vol. 33 No. 1 pp. 15, doi: https://doi.org/10.1108/eb033355
Download citation file:
93
Views
Suggested Reading
Research and Test Apparatus
Aircraft Engineering (April,1958)
US will keep new Sentinel ICBM despite rising costs
Expert Briefings (June,2024)
Russian ICBM use a response to use of Western missiles
Expert Briefings (November,2024)
Trump cannot arrest North Korean ICBM tests
Expert Briefings (July,2017)
North Korean ICBM launch reveals scope for escalation
Expert Briefings (February,2023)
Related Chapters
4. The 1950s: the development of Systems Management
The management of projects
References
The management of projects
Acronym List
Harnessing the Power of Failure: Using Storytelling and Systems Engineering to Enhance Organizational Learning
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
