Open figure viewer
A Yamazaki H22 power centre has reduced overall lead time for the production of certain aero engine components from 20–24 weeks using conventional methods, to just six weeks.
This content is only available via PDF.
© MCB UP Limited
1986
You do not currently have access to this content.