Open figure viewer
FOSTER Wheeler Energy and Air Products, in a joint venture, have been awarded a contract for the Nitrogen and Dry Air systems for the European Transonic Windtunnel (ETW), now under construction in Cologne. The total cost of the Nitrogen and Dry Air systems is anticipated to be around DM.55 million (£18.9m.).
This content is only available via PDF.
© MCB UP Limited
1990
You do not currently have access to this content.
