Skip to Main Content
Article navigation
Purpose

This paper seeks to address issues related to the development of a knowledge‐based engineering system for estimating manufacturing cost and weight of a composite structure at the conceptual stage of a design.

Design/methodology/approach

The system has been developed in the CATIA V5 knowledge environment and is applied to structures made of composite materials. At the conceptual stage of the design process, a structure is often represented by simple surfaces. The system adds the details necessary to accurately estimate weight and manufacturing cost using geometry and process‐based techniques. Knowledge captured from an expert was used to construct the knowledge base in the system.

Findings

It has been found that the system can provide continuous tracking of the weight and cost as the design evolves. Structural FEA and optimisation using MSC.NASTRAN have been integrated into the design process to enables the designer to conduct “what‐if” analyses to explore different design options involving geometry parameters such as the internal configuration of the structure.

Originality/value

The paper demonstrates that tools embedded in CAD systems can be expected to be able to facilitate the task of estimation of weight and manufacturing cost at the conceptual stage of the design process.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.