Open figure viewer
THE method of controlling work on the factory varies considerably. It can start from simply telling an operator the quantity required of a certain part, handing him the blueprint and telling him to get on with the job, to a complex breakdown where everything has been considered in advance, an exact line‐up prepared, and an adherence to a fixed production plan.
This content is only available via PDF.
© MCB UP Limited
1944
You do not currently have access to this content.
