IT was generally believed during early servicing experience of gas turbines that nearly every defect could result in power losses, but the last eight years have provided operational experience which has helped in the design, and improvements have made the gas turbine a trouble‐free and comparatively reliable unit. There are still defects which may arise, but it can safely be stated that they have no bearing on the power output. The customary teething troubles of early days have been overcome and power units are now available having an overhaul life of 500 hours. This figure is being increased rapidly and in the near future, the engine life between overhauls may exceed 1,000 hours. The overhaul of an engine provides an engine with a complete life cycle and the engine goes out into service embodied with improved design details, thus making it more reliable than before. The overhaul procedure consists of stripping, washing, crack testing, inspection, building and testing the engine, and a brief comment on each has been made in these notes, supported by a typical overhaul shop layout. The gas turbine power plant operating costs consist of primary and overhead charges, but in our discussion the overhead charges pertaining to overhaul will not be considered. These notes are a generalization of a variety of gas turbines and do not relate to any particular design.
Article navigation
Review Article|
July 01 1953
The Repair and Overhaul of Gas Turbines: Some Notes on the Organization and Facilities Used in the Maintenance of Jet Engines
F/O S.M. Saeed, B.Sc.(Eng.), D.C.Ae., Grad.R.Ae.S., R.P.A.F.
F/O S.M. Saeed, B.Sc.(Eng.), D.C.Ae., Grad.R.Ae.S., R.P.A.F.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2059-9366
Print ISSN: 0002-2667
© MCB UP Limited
1953
Aircraft Engineering (1953) 25 (7): 200–201.
Citation
Saeed FS (1953), "The Repair and Overhaul of Gas Turbines: Some Notes on the Organization and Facilities Used in the Maintenance of Jet Engines". Aircraft Engineering, Vol. 25 No. 7 pp. 200–201, doi: https://doi.org/10.1108/eb032312
Download citation file:
1,383
Views
New and popular articles
Suggested Reading
Overhaul Life Development and Early Failure Detection of Aircraft Gas Turbines: A Description of the Methods By Which Scheduled and Unscheduled Engine Removals May Be Minimized Based on the Techniques Adopted by Trans‐Canada Airlines for Use with Rolls‐Royce Tyne, Conway and Dart Engines
Aircraft Engineering (October,1962)
Prepared for overhauling the RB211
Aircraft Engineering (November,1973)
Cleaning Gas Turbine Compressors: Some Service Experience with a Wet‐wash System
Aircraft Engineering (January,1983)
Optimization of the aircraft general overhaul process
Aircraft Engineering and Aerospace Technology: An International Journal (August,2013)
Condition monitoring of steam turbines by performance analysis
Journal of Quality in Maintenance Engineering (June,2003)
Related Chapters
2.Turning the AGRs into a success
Fuel management and handling
11 Turbines for the Barrage
Severn Barrage: Proceedings of a symposium organized by the Institution of Civil Engineers, held in London on 8-9 October 1981
9. Reliability of LP steam turbines
Technology of turbine plant operating with wet steam
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.