AS a preliminary to the detail description of the Harrier V/S.T.O.L. Operational Trainer — designated Harrier T. Mk. 2 — it is worth recalling that Hawker Siddeley first made proposals for a dual version of the P.1127 as early as September 1960 (Fig. 1). However, due to the relatively small number of early P.1127 and Kestrel aircraft, efforts to introduce a trainer proved abortive until the Harrier G.R. Mk. 1 production order materialised, following the batch of six Harrier development single seatcr aircraft. A feasibility study for a V/S.T.O.L. Dual Version Harrier was submitted to MinTech in September 1965. This was followed up by a project study in April 1967, which culminated in firm orders for two development two‐seater aircraft, to be followed by a batch of production aircraft.
Article navigation
Review Article|
April 01 1970
The Harrier T. Mk. 2
Publisher: Emerald Publishing
Online ISSN: 2059-9366
Print ISSN: 0002-2667
© MCB UP Limited
1970
Aircraft Engineering (1970) 42 (4): 33–43.
Citation
(1970), "The Harrier T. Mk. 2". Aircraft Engineering, Vol. 42 No. 4 pp. 33–43, doi: https://doi.org/10.1108/eb034623
Download citation file:
188
Views
New and popular articles
Suggested Reading
Flight Test Programme
Aircraft Engineering (April,1970)
The Harrier Cockpit
Aircraft Engineering (February,1970)
Introduction to the Hawker Siddeley Harrier
Aircraft Engineering (December,1969)
HARRIER: Catalyst for Change in Naval Airpower
Aircraft Engineering (December,1984)
Sea Harrier — A New Dimension
Aircraft Engineering (June,1981)
Related Chapters
STOL OPERATIONS
WORLD AIRPORTS THE WAY AHEAD
10 Stol: airport access made easy
Airports for people
Short take-off and landing
Airports for the 1980s.
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
