Open figure viewer
THERE HAS BEEN a continuous improvement in capability of the F28 since its certification in February 1969. This development is depicted in maximum design weight growth and the operational envelope given in fig 11. It shows the advantage of the strength potential, demonstrated by the structural test programme results so that only local modifications were needed.
This content is only available via PDF.
© MCB UP Limited
1973
You do not currently have access to this content.
