Open figure viewer
This emergency generating system was first fitted on the 01 and 02 pre‐production Concordes and will be installed on the production aircraft. Initial design work commenced in 1967 and a fully developed and type‐tested unit went into production in 1971.
This content is only available via PDF.
© MCB UP Limited
1973
You do not currently have access to this content.
