Skip to Main Content
Article navigation

Design‐to‐cost (DTC), a new American design control method, was almost unheard of in Europe only a few years ago. Since 1976, Aerospatiale's Aircraft Division has set up the means needed to implement a method which is derived from design‐to‐cost and is intended for new civil aircraft programmes. The Aircraft Division calls it “Conception pour in Coüt Optimum” (CCO).

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal