Open figure viewer
THE General Electric Company of the USA Aircraft Engine Business Group's nex flexible machining centre in Lynn, Massachusetts recently produced its first production engine parts only 16 months after ground breaking.
This content is only available via PDF.
© MCB UP Limited
1986
You do not currently have access to this content.
