Skip to Main Content
Article navigation

THE problems attached to the installa‐tion of modern high duty aero engines are rapidly becoming more difficult. Almost every aero‐engine firm has its own installation department consisting of highly skilled technologists who are in continual co‐operation with the aircraft builders during the design and initial engine installation stages of new type aeroplane. Only by the closest liaison between the engine and the aeroplane manufacturers during the early stages of design can maximum efficiency and successful results be expected from their products.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal