Skip to Main Content
Article navigation

FIRST flow measurements are being carried out on a model of the European spaceplane Hermes in the MBB Transport Aircraft Group's Bremen wind tunnel. As part of the Hermes preliminary development program MBB is responsible for performing a comprehensive series of measurements on models of different sizes to determine the optimum spaceplane and configuration for atmospheric flight. The measurements are being undertaken in a number of industrial wind tunnels owned by European aerospace companies and in research institutes.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal