Open figure viewer
FIRST flow measurements are being carried out on a model of the European spaceplane Hermes in the MBB Transport Aircraft Group's Bremen wind tunnel. As part of the Hermes preliminary development program MBB is responsible for performing a comprehensive series of measurements on models of different sizes to determine the optimum spaceplane and configuration for atmospheric flight. The measurements are being undertaken in a number of industrial wind tunnels owned by European aerospace companies and in research institutes.
This content is only available via PDF.
© MCB UP Limited
1988
You do not currently have access to this content.
