Article navigation

FOSTER Wheeler Energy and Air Products, in a joint venture, have been awarded a contract for the Nitrogen and Dry Air systems for the European Transonic Windtunnel (ETW), now under construction in Cologne. The total cost of the Nitrogen and Dry Air systems is anticipated to be around DM.55 million (£18.9m.).

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal