Open figure viewer
In July 1966 John I. Thompson & Company accepted a contract with the Picatinny Arsenal, US Department of the Army, to perform a study aimed at developing ‘Criteria for evaluating the effectiveness of library operations and services’ under the ATLIS Program (Army Technical Library Improvement Studies). The study was divided into three phases aimed at:
This content is only available via PDF.
© MCB UP Limited
1968
You do not currently have access to this content.
