Due‐date performance (DDP) is a very important performance indicator for the companies. Thus, companies with a high hit rate would have greater competitive advantage; on the contrary, companies that delay customers' orders frequently would lose sales opportunities and reputations. Therefore, there were many academic studies and practical efforts to improve DDP in the past, but the problem of low hit rate still exists. In order to increase the hit rate, some companies have focused on reducing the variation, while others focus on production management, but is the real problem affecting the low rate variability or production management? This is indeed difficult to be validated through practice. Therefore, this study designed three scenarios, tested each scenario for 30 times, each test involved seven subjects. The tests were to provide counter‐evidence in the Job Shop environment without variation. If the variation is the main factor of affecting hit rate, the rate at this time should be good; otherwise, the assumption that variation is the main cause is rebutted. The results demonstrated that production management planning is the main cause, and the method of enhancing the hit rate is obtained during the test.
Article navigation
18 December 2009
Review Article|
December 18 2009
An Experimental Study to Improve Due‐date Performance
Mei‐Ting Wang;
Mei‐Ting Wang
Department of Industrial Engineering and Management, National Chiao‐Tung University, 1001 University Road, Hsin‐chu, Taiwan 300, R.O.C.
Search for other works by this author on:
MRong‐Kwei Li;
MRong‐Kwei Li
Department of Industrial Engineering and Management, National Chiao‐Tung University, 1001 University Road, Hsin‐chu, Taiwan 300, R.O.C.
Search for other works by this author on:
Ching‐Piao Chen;
Ching‐Piao Chen
Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, R.O.C.
Search for other works by this author on:
Hsien‐Ching Chen;
Hsien‐Ching Chen
Center for General Education, Chung‐Hua University, No. 707, Sec. 2, WuFu Rd., Hsin‐Chu, Taiwan 300, R.O.C.
Search for other works by this author on:
Chih‐Hung Tsai
Chih‐Hung Tsai
Department of Information Management, Yuanpei University, No. 306, Yuanpei Street, Hsin‐Chu, Taiwan
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2054-555X
Print ISSN: 1598-2688
© Emerald Group Publishing Limited
2009
Asian Journal on Quality (2009) 10 (3): 13–36.
Citation
Wang M, Li M, Chen C, Chen H, Tsai C (2009), "An Experimental Study to Improve Due‐date Performance". Asian Journal on Quality, Vol. 10 No. 3 pp. 13–36, doi: https://doi.org/10.1108/15982680911021160
Download citation file:
New and popular articles
Suggested Reading
Constructing a production exception handling system for the semiconductor manufacturing process
Kybernetes (October,2011)
Contour- and Texture-based analysis for victim identification in forensic odontology
Data Technologies and Applications (September,2021)
Reference data and geocoding quality: Examining completeness and positional accuracy of street geocoded crime incidents
Policing: An International Journal (May,2013)
An alternative formula for the constant growth model
Journal of Economics, Finance and Administrative Science (May,2019)
A hybrid model of competitive capabilities
International Journal of Operations & Production Management (April,2011)
Related Chapters
Organizational Learning and Firm Profitability: The Role of Competitive Advantage
Advances in Accounting Behavioral Research
From Tourism Space to a Unique Tourism Place through a Conceptual Approach to Building a Competitive Advantage
Marketing Places and Spaces
Regulatory Evolution, Multinational Firms, and Neo-Transition Economies
Neo-Transitional Economics
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.