The definition of cycle time is the time from the wafer start to the wafer output. It usually takes one or two months to get the product since customer decides to produce it. The cycle time is a critical factor for customer satisfaction because it represents the response time to the market. Long cycle time reflects the ineffective investment for the capital. The cycle time is very important for foundry because long cycle time will cause customer unsatisfied and the order loss. Consequently, all of the foundries put lots of human source in the cycle time improvement. Usually, we make decisions based on the experience in the cycle time management. We have no mechanism or theory for cycle time management. We do work‐in‐process (WIP) management based on turn rate and standard WIP (STD WIP) set by experiences. But the experience didn’t mean the optimal solution, when the situation changed, the cycle time or the standard WIP will also be changed. The experience will not always be applicable. If we only have the experience and no mechanism, management will not be work out. After interview several foundry fab managers, all of the fab can’t reflect the situation. That is, all of them will have an impact period after product mix or utilization varied. In this study, we want to develop a formula for standard WIP and use statistical process control (SPC) concept to set WIP upper/lower limit level. When WIP exceed the limit level, it will trigger action plans to compensate WIP Profile. If WIP Profile balances, we don’t need too much WIP. So WIP level could be reduced and cycle time also could be reduced.
Article navigation
18 December 2008
Review Article|
December 18 2008
The Study of the Cycle Time Improvement by Work‐In‐Process Statistical Process Control Method for IC Foundry Manufacturing
Yu‐Cheng Lin;
Yu‐Cheng Lin
Department of Industrial Engineering and Management, National Chiao‐Tung University, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Chih‐Hung Tsai;
Chih‐Hung Tsai
Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Rong‐Kwei Li;
Rong‐Kwei Li
Department of Industrial Engineering and Management, National Chiao‐Tung University, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Ching‐Piao Chen;
Ching‐Piao Chen
Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Hsien‐Ching Chen
Hsien‐Ching Chen
Center for General Education, Chung‐Hua University, No.707, Sec.2, WuFu Rd., Hsin‐Chu, Taiwan 300, R.O.C
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2054-555X
Print ISSN: 1598-2688
© Emerald Group Publishing Limited
2008
Asian Journal on Quality (2008) 9 (3): 71–91.
Citation
Lin Y, Tsai C, Li R, Chen C, Chen H (2008), "The Study of the Cycle Time Improvement by Work‐In‐Process Statistical Process Control Method for IC Foundry Manufacturing". Asian Journal on Quality, Vol. 9 No. 3 pp. 71–91, doi: https://doi.org/10.1108/15982688200800028
Download citation file:
New and popular articles
Suggested Reading
An overview of path design and dispatching methods for automated guided vehicles
Integrated Manufacturing Systems (October,1998)
Reclaiming “management” from the margins: some evidence from 360 degree assessments
Industrial and Commercial Training (April,2013)
Dispatching Procedures for a Flexible Manufacturing Cell in Constant Production Circumstances
International Journal of Operations & Production Management (November,1993)
“I am doing my part, you are doing your part”: the sworn-civilian divide in police dispatching
Policing: An International Journal (November,2022)
Examining links between dispatch time, deployment time and case resolution in agency incident data
Policing: An International Journal (August,2025)
Related Chapters
The Renaissance Foundry: A Self-Guided Instrument for Holistic Centered Faculty Development
Faculty Development on a Shoestring: Programs to Support Higher Education Faculty Using Little or No Resources
Noname Nightmare: Resolving Customer Complaints in Hospitality
Management
Trade Tales: Decoding Customers' Stories
Organizational Culture at Offshore Service Centres of Central and Eastern Europe
Understanding National Culture and Ethics in Organizations: A Study of Eastern and Central Europe
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
