Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Maintenance
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Adopting quality management principles to revitalise the facilities maintenance practices at a port: A study in Trinidad and Tobago
Available to Purchase
Journal:
Asian Journal on Quality
Asian Journal on Quality (2010) 11 (3): 197–209.
Published: 26 November 2010
...). Design/methodology/approach Empirical data were acquired via interviews with the FM management and maintenance personnel and questionnaire survey with port employees. Findings In Trinidad and Tobago (T&T), many facilities at the port have been operated below optimum ability, and there has been...
Journal Articles
Ordering Policy for Planned Maintenance with Salvage Value
Available to Purchase
Journal:
Asian Journal on Quality
Asian Journal on Quality (2006) 7 (3): 15–23.
Published: 18 December 2006
...Young T. Park; Sun Jing A spare ordering policy is considered for planned maintenance. Introducing the ordering, uptime, downtime, inventory costs and salvage value, we derive the expected cost effectiveness. The problem is to determine jointly the ordering time for a spare and the preventive...
