Skip to Main Content
Article navigation
Purpose

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.

Design/methodology/approach

Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.

Findings

Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.

Practical implications

Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.

Originality/value

This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal