Skip to Main Content
Article navigation
Purpose

Building Information modelling (BIM) has the potential to significantly minimise the quantity of construction waste (CW), but its adoption is low in construction waste management (CWM). This study examined the factors impeding the adoption of BIM in CWM efforts at the design and precontract stages from the perspective of construction stakeholders in Nigeria.

Design/methodology/approach

The study was informed by a post-positivism philosophical stance, which involved using the structured questionnaire as a quantitative research design tool for data collection via snowball sampling technique. The data garnered from construction experts were analysed using Cronbach’s alpha test, normalities test, Frequency, Percentage, Kendall’s coefficient of concordance and Chi-square tests, Analysis of variance (ANOVA), and exploratory factors analysis (EFA).

Findings

The study concluded that the awareness of BIM potential for CWM is high, but the adoption in waste management (WM) is low. The factor analysis reduced the twenty assessed factors into four key clusters of impediments to BIM adoption in CWM: (1) knowledge and resistance barriers, (2) support and interest barriers, (3) interoperability and experts' factors, and (4) economic barriers. These factors are critical impediments to BIM-enabled CWM at the design and precontract stage, and there was no significant statistical difference in their rating by the construction stakeholders in Nigeria.

Originality/value

Studies on the impediments to BIM adoption in CWM efforts, primarily at the design and pre-contract stages in emerging countries are scarce. This sought to fill this literature gap by establishing the critical impediments that should be overcome to improve BIM use in CWM.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal