Article navigation
Purpose

The purpose of this paper is to present an assessment of the challenges to the implementation of building management systems (BMS) in Saudi Arabia, during the life cycle of building projects.

Design/methodology/approach

Review of literature and interviews were conducted with professionals to identify and synthesize the challenges to the implementation of BMS in Saudi Arabia. This formed the basis of three questionnaire surveys that were designed utilizing a five-point Likert scale, and consisted of 32 challenges. The surveys were assessed by representatives of architectural/engineering (A/E) firms, BMS installation sub-contractors and facilities managers to calculate the effect index of each challenge.

Findings

The top influential challenges pertaining to the briefing and design phase includes “inappropriate selection of the BMS,” “inappropriate selection of the A/E team”; installation and final acceptance phase includes “inappropriate selection of sub-contractors to install the BMS” and “inappropriate selection of the BMS suppliers,” operation and maintenance phase includes “inadequate initial training for the BMS facility personnel,” “poor operation and maintenance activities.”

Practical implications

The paper is of practical benefit to stakeholders in the building industry, as it allows for the development of an effective BMS implementation plan.

Originality/value

The study increases the level of awareness in the building industry about the challenges that influence the implementation of BMS.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal