Skip to Main Content
Keywords: Case study
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Built Environment Project and Asset Management (2025) 15 (4): 879–893.
Published: 21 May 2025
... of ECI on small projects. This study aims to investigate the potential benefits and challenges of ECI in a small construction project in Norway. Design/methodology/approach The research design is based on an embedded case study approach with longitudinal evaluation. The empirical data...
Journal Articles
Built Environment Project and Asset Management (2025) 15 (3): 432–449.
Published: 30 January 2025
... success factors identified in existing literature contribute to the success of a real-world adaptive reuse project?”. Design/methodology/approach This research utilizes a case study methodology to explore the adaptive reuse phenomenon through the lens of the Fenix I in the Netherlands. Three...
Journal Articles
Built Environment Project and Asset Management (2024) 14 (2): 260–277.
Published: 29 December 2023
... and interdependencies in metro rail projects. Megaprojects Metro rail projects Case study Complexities DEMATEL Dara Sruthilaya can be contacted at: sruthilayadara@student.nitw.ac.in 07 09 2023 06 11 2023 06 12 2023 © Emerald Publishing Limited 2023 Emerald Publishing...
Journal Articles
Built Environment Project and Asset Management (2020) 10 (4): 567–583.
Published: 27 May 2020
...Arinola Adefila; Amal Abuzeinab; Timothy Whitehead; Muyiwa Oyinlola Purpose This paper develops a novel user-acceptance model for circular solutions to housing design. The model has been systematically developed from a case study of an upcycled plastic bottle building in a low-income community...
Journal Articles
Built Environment Project and Asset Management (2020) 10 (3): 423–435.
Published: 09 December 2019
... Information Modelling (BrIM) models for an ongoing bridge project. Design/methodology/approach An ethnographic action-based case study research methodology is adopted in this study. An ongoing bridge construction project in India is chosen and the 4D BrIM application is evaluated both quantitatively...
Journal Articles
Built Environment Project and Asset Management (2019) 9 (1): 153–167.
Published: 05 December 2018
.... The main methodological approach is based on participant observation, through case studies complemented by a questionnaire. Findings This paper reports on results and analysis of an important module of a broader research project on the impact of new technologies and collaborative methods for projects...
Journal Articles
Journal Articles
Built Environment Project and Asset Management (2018) 8 (2): 171–182.
Published: 13 April 2018
... from three sources namely literature review, case studies and nominal group technique (NGT). The strategies were then evaluated quantitatively using NGT. Findings The analysis of the case studies showed that the delays in utility relocation were in the range of 5-52 months. It was found...
Journal Articles
Built Environment Project and Asset Management (2016) 6 (3): 253–267.
Published: 04 July 2016
... to be replicated in future. Design/methodology/approach – To explore the practical development experiences and technological applications, a case study was conducted, involving both document analysis and semi-structured interviews. Findings – The findings identify the green technologies and strategies...
Journal Articles
Built Environment Project and Asset Management (2016) 6 (2): 139–158.
Published: 03 May 2016
... literature review and a case study were undertaken to identify the life cycle changes of typical buildings over a period of more than 100 years. In total, 12 semi-structured interviews were conducted among construction industry professionals to identify how adaptable buildings enhance sustainability within...
Journal Articles

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.