Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Constraints
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Automation in New Zealand's offsite construction (OSC): a status update
Available to Purchase
Built Environment Project and Asset Management (2022) 12 (1): 38–52.
Published: 25 March 2021
...). Wajiha Mohsin Shahzad can be contacted at: W.M.Shahzad@massey.ac.nz 09 11 2020 01 02 2021 01 03 2021 © Emerald Publishing Limited 2021 Emerald Publishing Limited Licensed re-use rights only Automation Constraints New Zealand Offsite construction (OSC) Prefabrication...
Journal Articles
Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry
Available to Purchase
Built Environment Project and Asset Management (2020) 10 (1): 94–109.
Published: 16 October 2019
...Rex Asibuodu Ugulu; Andrew Arewa; Stephen Allen Purpose The purpose of this paper is to establish the perception of tradespeople about project-specific constraints (PSCs) influencing construction productivity in Nigeria. Design/methodology/approach Using a qualitative descriptive survey...
Journal Articles
Constraints in implementing Public Private Partnership (PPP) in Malaysia
Available to Purchase
Built Environment Project and Asset Management (2014) 4 (3): 238–250.
Published: 07 July 2014
... to investigate the differences in the perceptions of the government and the private sector pertaining to the hindrance factors. Design/methodology/approach – A questionnaire survey was used to elicit the perceptions of the public and private sectors concerning the constraints of PPP implementation...
