Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Multi-objective optimization
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Integrated project scheduling and resource procurement problem: maximizing net-present-value and minimizing cradle-to-gate CO2 emissions
Available to Purchase
Built Environment Project and Asset Management (2025) 15 (5): 901–923.
Published: 28 July 2025
... scheduling and resource procurement (PSRP) decisions for construction projects with a rent-or-buy strategy to minimize the cradle-to-gate CO2 emissions and maximize the net present value. Design/methodology/approach A multi-objective optimization approach is adopted to optimize two objectives...
Includes: Supplementary data
Journal Articles
Dynamic scheduling model for the construction industry
Available to Purchase
Built Environment Project and Asset Management (2020) 10 (3): 313–330.
Published: 20 January 2020
... multi-objective optimization of cost, time, resources and cash flow, throughout project construction. Design/methodology/approach Upon reviewing the topic of DS, a worldwide internet survey with 364 respondents was conducted to define end-user requirements. The model was formulated and solution...
Journal Articles
Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
Available to Purchase
Built Environment Project and Asset Management (2019) 9 (1): 44–63.
Published: 02 January 2019
... has been developed to perform multi-objective optimization and identify Pareto optimal solutions. The RR-PARETO3 algorithm was used to identify the best compromise trade-off solutions. The effectiveness of the proposed framework is demonstrated through sample case study projects. Findings Results...
