Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Risk analysis
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Built Environment Project and Asset Management (2017) 7 (1): 45–58.
Published: 06 February 2017
... Risk analysis Built operate transfer In a build-operate-transfer (BOT) delivery system, a special purpose vehicle (SPV) designs, funds, builds and operates a public infrastructure for a specified concession period at the end of which the facility is transferred back to the public authority...
Journal Articles
Built Environment Project and Asset Management (2014) 4 (4): 384–405.
Published: 02 September 2014
... techniques were identified as the preferred methods in maintenance for risk identification while a risk rating matrix is used for risk analysis. Lack of awareness and indifference towards risk assessment; make effective risk assessment very difficult. These drawbacks can be minimised by education, systematic...
Journal Articles
Built Environment Project and Asset Management (2013) 3 (2): 199–213.
Published: 18 November 2013
... techniques of risk management, generally, are comprised of three phases: risk identification, risk analysis or measurement, and risk mitigation. The risk mitigation can be further divided into risk avoidance, risk reduction, risk transfer or shifting, and risk retention (Cheah and Garvin, 2009...
Journal Articles
Built Environment Project and Asset Management (2013) 3 (1): 123–140.
Published: 05 July 2013
...Nayanthara De Silva; Malik Ranasinghe; C.R. De Silva Purpose Artificial neural network (ANN) has been used for risk analysis in various applications such as engineering, financial and facilities management. However, use of a single network has become less accurate when the problem is complex...
