Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Road construction
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Built Environment Project and Asset Management (2025) 15 (3): 647–662.
Published: 20 December 2024
...U.T.G. Perera; Richard Haigh; Dilanthi Amaratunga Purpose This study aims to identify the key barriers and enablers within a developing country context (Sri Lanka) to tackle the public health impacts during road construction projects. The current impact assessment process of the country...
Journal Articles
Built Environment Project and Asset Management (2020) 10 (5): 673–691.
Published: 17 August 2020
... regarding what risk variables to focus attention on in road construction. The developed models are also potential practical tools for decision-making. Originality/value The study provides a veritable tool for risk assessment that potentially helps with predicting risk impact on cost and time performance...
Journal Articles
Built Environment Project and Asset Management (2017) 7 (4): 426–440.
Published: 14 September 2017
... and related payments to the contractor in road construction in Sri Lanka is not much popular among the extant literature. Thus, the purpose of this paper is to explore different payment mechanisms that are being used with environmental hazard-controlling methods, to achieve better control in such hazards...
Journal Articles
Built Environment Project and Asset Management (2016) 6 (5): 521–534.
Published: 07 November 2016
... a DAT, the most important criterion is the acceptability of the technique to courts and tribunals. “Window Analysis” was found to be the most appropriate DAT that can be used in road construction projects in Sri Lanka. Originality/value “Window Analysis” can be recommended as the most appropriate...
