Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Saudi Arabia
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Critical success factors for large building construction projects: Perception of consultants and contractors
Available to Purchase
Built Environment Project and Asset Management (2020) 10 (3): 349–367.
Published: 20 January 2020
...Hasan Mathar; Sadi Assaf; Mohammad A. Hassanain; Abdullatif Abdallah; Ahmed M.Z. Sayed Purpose The literature revealed a limited number of studies on critical success factors (CSFs) in Saudi Arabia. These studies were either outdated, covered limited factors or focused on very specific issues...
Journal Articles
Drivers of e-bidding implementation in the Saudi Arabian construction industry
Available to Purchase
Built Environment Project and Asset Management (2020) 10 (1): 16–27.
Published: 02 October 2019
...Ahmed M.Z. Sayed; Sadi Assaf; Adel S. Aldosary; Mohammad A. Hassanain; Abdullatif Abdallah Purpose The purpose of this paper is to identify the key drivers for adopting electronic bidding (e-bidding) systems in public construction projects located in Saudi Arabia. Design/methodology/approach...
Journal Articles
Significant causes of claims and disputes in construction projects in Saudi Arabia
Available to Purchase
Built Environment Project and Asset Management (2019) 9 (5): 597–615.
Published: 18 June 2019
... contributors to claims and disputes in Saudi Arabia: “change or variation orders due to new requirements from client” (78 percent), “variations in quantities due to new requirements from client” (74 percent), “delay caused by contractor” (74 percent), “design errors or omissions” (72 percent...
Journal Articles
Physical asset management practices in the Saudi public sector
Available to Purchase
Built Environment Project and Asset Management (2017) 7 (1): 19–31.
Published: 06 February 2017
... in the country’s physical assets since its emergence and the formal AM practice development worldwide. Saudi Arabia did not experience considerable development until the 1970s, following a marked rise in oil prices (Dew, 2003). Thereafter, decisions about development were made based on a series of five-year...
