Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Survey
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Built Environment Project and Asset Management (2026) 16 (3): 484–502.
Published: 20 January 2026
... the factors. Six experts from the Iraqi Public Authority for Roads and Bridges (PARB) refined the list to 32 factors via semi-structured interviews. A questionnaire survey was then carried out. In total, 46 responses were received and analyzed using both descriptive and inferential methods. Descriptive...
Journal Articles
Built Environment Project and Asset Management (2020) 10 (1): 153–179.
Published: 05 February 2020
... groups. The sampling frame for the study was defined in terms of public construction projects (mostly related to roads) owned by the Ministry of Public Works and Housing in Jordan. A survey was conducted with engineers working as representatives of the owner, contractors or consultants to elicit...
Journal Articles
Patrick Manu, Abdul-Majeed Mahamadu, Colin Booth, Paul Olomolaiye, Ahmed Doko Ibrahim, Akinwale Coker
Built Environment Project and Asset Management (2018) 8 (4): 386–402.
Published: 13 September 2018
.../approach A total of 30 procurement capacity challenges drawn from literature were operationalized in a survey of infrastructure procurement personnel in different tiers of public agencies (i.e. local and state government) in order to ascertain the critical challenges affecting the effectiveness...
