Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Pareto analysis
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Performance evaluation of Indian Railway zones using DEMATEL and VIKOR methods
Available to Purchase
Benchmarking: An International Journal (2016) 23 (1): 78–95.
Published: 01 February 2016
... is first evaluated using DEMATEL method which addresses the inter-relationships between different criteria with the aid of a relationship structure. The VIKOR method which is a compromise ranking approach is then adopted to rank those candidate railway zones. Pareto analysis is also carried out to identify...
Journal Articles
Strategic approach to breakdown maintenance on construction plant – UAE perspective
Available to Purchase
Benchmarking: An International Journal (2014) 21 (2): 226–252.
Published: 01 April 2014
..., the components and the breakdown codes namely breakdown main codes (BMC) and breakdown sub-codes (BSC) are formulated. With Pareto analysis, the critical codes are identified and validated through failure modes and effects analyses (FMEA) tools for the critical effect on the affected components. From...
Journal Articles
Construction plant breakdown criticality analysis – part 1:UAE perspective
Available to Purchase
Benchmarking: An International Journal (2011) 18 (4): 472–489.
Published: 12 July 2011
... in the system in construction plant is presented. Design/methodology/approach The past plant breakdown records of a construction organization are considered for the analysis. From the previous breakdown records, a high level metric using Pareto analysis and the cause effect analysis is used to identify...
