Managing dams Challenges in a time of change
Edited by
Emerald Publishing Limited
ISBN print:
978-0-7277-4099-1
Publication date:
2010
Book Chapter
Design of replacement vertical lift sluice gate for Kinloch Rannoch Weir
By
R. J. DIGBY;
R. J. DIGBY
Kenneth Grubb Associates Ltd, Bournemouth, UK.
Search for other works by this author on:
J. P. SELBIE
J. P. SELBIE
Enterprise Engineering Services Ltd, Aberdeen, UK.
Search for other works by this author on:
R. J. DIGBY
Kenneth Grubb Associates Ltd, Bournemouth, UK.
J. P. SELBIE
Enterprise Engineering Services Ltd, Aberdeen, UK.
-
Published:2010
Citation
R. J. DIGBY, J. P. SELBIE, 2010. "Design of replacement vertical lift sluice gate for Kinloch Rannoch Weir", Managing dams Challenges in a time of change, Andrew Pepper
Download citation file:
Open figure viewer
SYNOPSIS
INTRODUCTION
PREVIOUS MAINTENANCE AND ENABLING WORKS
DESIGN OF EXISTING GATE
DESIGN OF REPLACEMENT GATE
CONSTRUCTION AND INSTALLATION OF REPLACEMENT GATE
REFERENCES
You do not currently have access to this chapter.
Related Topics
Email alerts
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
