At the beginning of the last century about 40 gravity dams were built in Germany. During the last years extensive rehabilitation measures were carried out at several old masonry dams. Rehabilitation concepts which called for the construction of inspection/drainage galleries inside the dams turned out to be rather cost-efficient. Different methods for the construction of these inspection galleries were used – from manual driving of the tunnel to the drill & blast method and the use of a tunnel boring machine. The specific costs of these galleries varied, depending on the construction method.

  • INTRODUCTION

  • THE DAMS

  • REHABILITATION CONCEPT “DRAINING THE DAM”

  • REHABILITATION

  • PROOF OF THE SUCCESSFUL REHABILITATION

  • COMPARISON OF THE CONSTRUCTION METHODS

  • COSTS AND CONCLUSIONS

  • REFERENCES

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.