Coasts, marine structures and breakwaters: Adapting to change: Proceedings of the 9th international conference organised by the Institution of Civil Engineers and held in Edinburgh on 16 to 18 September 2009
Edited by
Emerald Publishing Limited
ISBN print:
978-0-7277-4159-2
Publication date:
2010
Book Chapter
Armour Unit Placement and Positioning in 3D Real Time
By
Alain Mouquet
Alain Mouquet
Managing Director, MESURIS marine systems, Rennes France
Search for other works by this author on:
Alain Mouquet
Managing Director, MESURIS marine systems, Rennes France
-
Published:2010
Citation
Alain Mouquet, 2010. "Armour Unit Placement and Positioning in 3D Real Time", Coasts, marine structures and breakwaters: Adapting to change: Proceedings of the 9th international conference organised by the Institution of Civil Engineers and held in Edinburgh on 16 to 18 September 2009, William Allsop
Download citation file:
Open figure viewer
Introduction
Project systems criteria
POSIBLOC placement, monitoring and recording system for crawler cranes.
EXAMPLES of PROJECTS
OPERATIONNAL CONTROL
CRAWLER CRANE OPERATING CONFIGURATION
OPERATOR POSITION INDICATOR
VISIBLOC PROCESSING SOFTWARE
REPORTS AND PRINTOUTS
CONCLUSIONS
REFERENCES
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
