• Nuclear Power Plant, Neraichbach (KKN)

  • State of the Site in the Safe Enclosure

  • Total Dismantling of KKN

  • Sequence of Work

  • Approval Procedure (1980 to 1987)

  • Preparation Work (July 1987 to June 1988)

  • Dismantling of Inactive and Contaminated Areas

  • Remote dismantling of the reactor

  • Dismantling of the Biological Shield

  • Cancellation of Control Area and Conventional Demolition