Remote techniques for hazardous environments
Emerald Publishing Limited
ISBN print:
978-0-7277-5192-8
Publication date:
1996
Book Chapter
Boiler inspection manipulator for Torness Power Station
R. T. A. Carrey
I. Y. Yule
S. Sibson
M. J. Playle
-
Published:1996
Citation
R. T. A. Carrey, I. Y. Yule, S. Sibson, M. J. Playle, 1996. "Boiler inspection manipulator for Torness Power Station", Remote techniques for hazardous environments
Download citation file:
Open figure viewer
Introduction
Inspection Programme
Design Intent
Description of the BIM
In-Reactor Use
Typical BIM Operations During a Periodic Shutdown.
Inspection of Boiler Position Indicators
Safety and Reliability
Emergency Recovery
Summary
You do not currently have access to this chapter.
Related Topics
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
