3. Severn barrage: civil engineering aspects
-
Published:1990
D. Kerr, MA MICE, B. Severn, MA, MICE, S. J. Driver, BEng, MICE,, 1990. "3. Severn barrage: civil engineering aspects", Developments in tidal energy, Institution of Civil Engineers
Download citation file:
This paper describes the civil engineering designs and construction methods for a proposed tidal barrage in the Severn Estuary. The preferred construction method for the barrage is based on the use of reinforced concrete caissons, and designs for turbine, sluice, and plain caissons are described. The arrangements for embankments, ship locks, and barrage roads are also described. The designs were prepared as part of the Severn Barrage Development Project.
INTRODUCTION
ENVIRONMENTAL AND OPERATING CONDITIONS
TURBINE CAISSONS
SLUICE CAISSONS AND GATES
PLAIN CAISSONS AND EMBANKMENTS
ROADS
LOCKS AND NAVIGATION
BARRAGE CONSTRUCTION
CONSTRUCTION SEQUENCE AND PROGRAMME
CONSTRUCTION COST ESTIMATE