Investigation, monitoring and remedial works at Tiga Dam, Nigeria
-
Published:1992
H. S. Eadie, MSc, DIC, PEng, MICE, MIWEM, D. J. Coats, CBE, DSc, FICE, FEng, FRSE, N. Leyland, BEng, MICE, 1992. "Investigation, monitoring and remedial works at Tiga Dam, Nigeria", Water resources and reservoir engineering: Proceedings of the seventh conference of the British Dam Society held at the University of Stirling, 24–27 June 1992, Noel M. Parr, J. Andrew Charles, Susan Walker
Download citation file:
The embankment of Tiga Dam in Northern Nigeria has been a subject of concern since its construction in 1978. Unusually heavy rains in 1988, and the ensuing failure of an adjacent similar smaller dam built around the same time, further increased safety fears. This paper summarises the investigations undertaken to assess the safety of the embankment, the findings, and describes the short term remedial works carried out by the client's direct work organisation. The further long term remedial works are outlined along with the economic justification.
INTRODUCTION
BACKGROUND
INVESTIGATIONS
DAM ANALYSIS AND INTERPRETATION
REMEDIAL WORKS
GENERAL PROBLEMS/SUCCESS
MONITORING
SPILLWAY CAPACITY
LONG TERM REMEDIAL WORKS