• Introduction

  • Site and proposed structure

  • Ground conditions

  • Anticipated problems with basement construction

  • Temporary works options

  • Jet grouting

  • Design of jet grout works

  • Design aspects of the integrated solution

  • Site records, control measurements and testing

  • Observations and monitoring during excavation

  • Back analysis

  • Conclusions

  • Acknowledgements

  • References

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.