• Introduction

  • Bridge description

  • The static system

  • The external actions

  • Piers

  • Tower masts

  • Deck

  • Tie-rods

  • Bridge condition assessment

  • Rehabilitation works

  • Additional prestressing

  • Prestressing bars

  • Placement of ducts and bar insertion

  • Bars stressing

  • Sealing of the pvc ducts

  • Grout injection in the pvc tubes

  • Strands

  • Duct placement and strand insertion

  • Strand stressing

  • Sealing of the pvc ducts

  • Grout injection in the pvc tubes

  • Anti-torsion rings

  • Lifting of the central span for substitution of the damaged bearing devices

  • Repair of the stay cables concrete procedures

  • Final static load testing

  • Test results

  • Acknowledgements

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.