General aspects of ash disposal are followed by particular application to the major Gale Common scheme. The design of the 51m high embankments is presented in the context of the geology, materials available and environmental protection. Construction methods are described.

  • INTRODUCTION

  • APPLICATION TO GALE COMMON

  • THE SITE

  • GROUND INVESTIGATION

  • GEOTECHNICAL DESIGN

  • CONSTRUCTION

  • CONTRACTS

  • ACKNOWLEDGEMENT

  • REFERENCES