• Summary

  • 1 Introduction

  • 2 Column Test with Contaminated Groundwater from the Site

  • 3 Numerical Flow Modelling

  • 4 Design of the Funnel-And-Gate System

  • 5 Construction of the Funnel-And-Gate System

  • 6 Monitoring Results

  • Acknowledgement

You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.