Chapter 9 - Topographical curveying and construction control for motorways 1946-1983
-
Published:2004
R. M. Buchan, FRICS, 2004. "Chapter 9 - Topographical curveying and construction control for motorways 1946-1983", The Motorway Achievement: Volume 1: The British Motorway System: Visualisation, Policy andAdministration, Peter Baldwin, KCB, MA, FKC, FCIT, Hon.FIHT, CIMgt, FRSA, Robert Baldwin, BA, MLitt, MRIN, FLS
Download citation file:
Introduction to surveying practice, 1946-1983
The M4: Early motorway work in Wales (Newport By-pass and Port Talbot By-pass)
The M1, M45 and M18 motorways (Luton-Doncaster)
Luton to Crick: 58 Miles, 1955 to 1958
M1 and M18: Crick to Doncaster, 1958 to 1966
M1: Crick to the River Trent Crossing
M5 and M6: The Midland Links — 1959 to 1969
Metrication: September 1967
The M54 Motorway
Surveying Equipment
Anecdotes from the above surveys
