Bridge management 4: Inspection, maintenance, assessment and repair
Edited by
M. J. Ryall;
M. J. Ryall
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
G. A. R. Parke;
G. A. R. Parke
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
J. E. Harding
J. E. Harding
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
Emerald Publishing Limited
ISBN print:
978-0-7277-4589-7
Publication date:
2000
Book Chapter
Songsu Bridge, widening of an existing multi-span Truss Bridge
By
M. J. King;
M. J. King
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
Search for other works by this author on:
J. D. Howells;
J. D. Howells
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
Search for other works by this author on:
P. A. Sanders
P. A. Sanders
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
Search for other works by this author on:
M. J. King
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
J. D. Howells
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
P. A. Sanders
High-Point Rendel, 61 Southwark Street, London Tel. +44 20 7928 8999
-
Published:2000
Citation
M. J. King, J. D. Howells, P. A. Sanders, 2000. "Songsu Bridge, widening of an existing multi-span Truss Bridge", Bridge management 4: Inspection, maintenance, assessment and repair, M. J. Ryall, G. A. R. Parke, J. E. Harding
Download citation file:
Open figure viewer
Introduction
Background
The Need For Widening
Design
Construction Aspects
Conclusion
Acknowledgements
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
