Bridge management 4: Inspection, maintenance, assessment and repair
Edited by
M. J. Ryall;
M. J. Ryall
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
G. A. R. Parke;
G. A. R. Parke
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
J. E. Harding
J. E. Harding
Department of Civil Engineering, University of Surrey, UK
Search for other works by this author on:
Emerald Publishing Limited
ISBN print:
978-0-7277-4589-7
Publication date:
2000
Book Chapter
A14 Huntingdon Railway Viaduct
By
John St Leger
John St Leger
2W. S. Atkins, Cambridge. UK
Search for other works by this author on:
A. Wakeman
1Thorburn Colquhoun, Bedford. UK
John St Leger
2W. S. Atkins, Cambridge. UK
-
Published:2000
Citation
A. Wakeman, John St Leger, 2000. "A14 Huntingdon Railway Viaduct", Bridge management 4: Inspection, maintenance, assessment and repair, M. J. Ryall, G. A. R. Parke, J. E. Harding
Download citation file:
Open figure viewer
Description of Viaduct
Inspection and Assessment prior to 1996
Management of the Structure from 1996
Pier Top Strengthening
X Ray Investigation Trials
Access to the Deck Voids
Investigation from Inside the Deck Cells
Acoustic Monitoring
Sensitivity Analysis
Replacement of Joints and Waterproofing
Acknowledgements
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
