Bridge modification: Proceedings of the conference Bridge modification organized by the Institution of Civil Engineers and held in London on 23–24 March 1994
Edited by
Emerald Publishing Limited
ISBN print:
978-0-7277-4591-0
Publication date:
1995
Book Chapter
Rodenkirchen suspension bridge reconstruction and widening
By
R. Hornby
R. Hornby
Rendel Palmer and Tritton
Search for other works by this author on:
R. Hornby
Rendel Palmer and Tritton
-
Published:1995
Citation
R. Hornby, 1995. "Rodenkirchen suspension bridge reconstruction and widening", Bridge modification: Proceedings of the conference Bridge modification organized by the Institution of Civil Engineers and held in London on 23–24 March 1994, B. Pritchard
Download citation file:
Open figure viewer
Synopsis.
Introduction
Description of Existing Bridge
Reasons for Bridge Reconstruction
Design Alternatives and Chosen Solution
Possible Replacement of Existing Cables.
Final Design
Cable Load Equalisation
Summary
Acknowledgements
You do not currently have access to this chapter.
Email alerts
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
