Proceedings of the 3rd International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance
Emerald Publishing Limited
ISBN print:
978-0-7277-4201-8
Publication date:
2011
Book Chapter
LIFE-CYCLE COST ANALYSIS FOR BRIDGES: THE BASIS OF DECISION MAKING IN BRIDGE MANAGEMENT
By
Hitoshi Furuta;
Hitoshi Furuta
1Department of Informatics, Kansai University, Kansai University, Osaka 569-1095, Japan
Search for other works by this author on:
Dan M. Frangopol
Dan M. Frangopol
2Department of Civil Engineering, University of Colorado, Boulder, CO 80309-0428, USA
Search for other works by this author on:
Hitoshi Furuta
1Department of Informatics, Kansai University, Kansai University, Osaka 569-1095, Japan
Dan M. Frangopol
2Department of Civil Engineering, University of Colorado, Boulder, CO 80309-0428, USA
-
Published:2011
Citation
Hitoshi Furuta, Dan M. Frangopol, 2011. "LIFE-CYCLE COST ANALYSIS FOR BRIDGES: THE BASIS OF DECISION MAKING IN BRIDGE MANAGEMENT", Proceedings of the 3rd International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance, B.I.G.Barr, Lin Shaopei, Dan M. Frangopol, Liu Xila, R. J. Lark, Mao Renjie, Andrzej S. Nowak, Huang Zhen
Download citation file:
Open figure viewer
1. Introduction
2. Application of Genetic Algorithm to Life-Cycle Cost Analysis
3. Performance Prediction of Highway Bridges
4. Management of Network Bridges
5. Conclusions
You do not currently have access to this chapter.
Email alerts
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
